最近最经典中文MV字幕,国产成人无码精品久久二区三,在线一区二区三区,四川少妇BBB搡BBB爽爽爽视频

news

What should we do if the material tower is blocked?

In the pig farm, we can often see tall feed towers, which can help us solve the problem of feed. Feed towers provide feed to every pig house through feed pipes, but we will find that in some cases, the feed pipes are always blocked, so how should we solve the problem of blocking?
First of all, let's understand the causes of the blockage. Generally, the blockage is caused by the poor transportation of the metering tube of the electronic scale. The poor transportation of materials in the metering tube or the long time of material accumulation in the metering tube will lead to the difficulty of material unloading and the formation of the metering tube limit plug. The synchronous mechanical transmission system or electrical DC speed governing board control of the electronic scale and the feeding tower presents running fault, which causes the feeding out of synchronization and blockage. Secondly, it may be caused by the blockage of the blanking hood and the feed inlet. During the feeding operation, pay attention to the investigation of the operation and stop the machine immediately if the blanking inlet is found to be blocked. It can be concluded that the feeding fault of the tower system is caused by the unstable flow separation or no flow signal of the electronic scale, which is caused by the improper adjustment of the photoelectric switch and the rake roller.
So how can we solve these problems? First of all, we should check the working condition of the photocell, adjust the position of the photocell, readjust the gap between the rake roller and the lifting belt, and control the feeding height under the condition of ensuring the flow of the production line. Then repair the mechanical transmission system or electrical speed governing board fault parts, so that the material tower and electronic scale run six steps. Secondly, it is also necessary to open the maintenance observation window to check whether the blanking at the blanking port is smooth, and carry out local transformation. Check whether the connection between the blanking port and the metering pipe is reasonable and whether the design angle of the chute of the hopper is correct.
It's normal that the feed tower is blocked. If the feed density is too large or too small, it may cause the pipe blockage of the feed tower. As long as we find the blockage in time and solve the blockage problem.

  • Contact us
  • Web:http://www.www.bowvalleybabysitting.com/en/
  • http://qdph.en.alibaba.com
  • Tel/Whatsapp/Wechat:+8618266221406 +15621127700
  • Email:elsa@www.bowvalleybabysitting.com nanaliu@www.bowvalleybabysitting.com
  • Focus on us
  • Sales service hotline
  • 18660928200
  • Address:The streets of Bei'an Li Ling Industrial Park in Qingdao city of Jimo
  • Address:China Shandong Linyi Town Secondary Village Development Zone

Copyright 2017 Qingdao Puhui Agriculture and Animal Husbandry Science and Technology Co., Ltd. All Rights Reserved

欧美激情肥婆婬妇BBB | 欧美黄色高清视频 | 99无码熟妇丰满人妻啪啪 | 潘金莲一级婬片AAAAA广告 | 丝袜美腿人妻AV在线 | 性欧美ⅩXXXX极品护士 | 国产成人婬片A片免费hhh一区 | 日本爱v视频播放 | 在线观看无码视频播放 | 欧美性猛交XXXX乱大交退制版 | 日本理伦公与丰满熄中文字幕 | 久久成人免费视频 | 蜜桃Av久久精品人人槡 | 无码乱码在线免费观看 | 搡BBBB搡BBB搡五十 | 特级毛片片A片AAAAAA | 国产又粗又大又黄 | 亚洲精品国产av | 天天夜碰日日摸日日躁性色av | 日韩中文字幕无码中字字幕 | 久久精品国产亚洲AV麻豆仙踪林 | 亚洲日韩精品AV无码久久鸭漫画 | 国产一级无码成人片 | www内射高潮在线视频播放 | 可以免费看黄的网站 | 东北少扫搡BBw搡BBBB | 成人免费h无码网站在线观看 | 久久久久久久久久久高清毛片一级 | www.激情五月天.com | 无码欧美成人XXXXX | 久久久久成人影片 | 国产 高潮流白浆 | 国产日本精品视频 | 国产偷∨国产偷∨精品视频 | 亚洲午夜精品影院 | 久久久久久久久久久久久久丰满 | 强伦轩人妻一区二区三区70后 | 高潮国产白浆抽搐的视频免费软件 | 中文字幕aV无码一区二区三区 | 8x8ⅹ成人永久免费观看 | 三级在线观看视频网站 |